The length of the structure is 240 meters, and the whole thing weighs 1,250 tons. It is taken to the required section piece by piece, after which it is assembled and the two-lane traffic is started.

At the same time they are working on a 100-meter section from below. As soon as it is finished, the bridge is moved a hundred meters forward by remote control.